ITAC Assessment: NL0026
ITAC logo
ITAC Assessment: NL0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Printed Paperboard Packaging
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 162
Plant Area 230,000
ft2
Annual Production 150,000,000
units
Production Hrs. Annual 4,480
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,564 3,766,961
kWh
Electricity Demand $200,185 13,876
kW-mo/yr
Electricity Fees $49,903 -
Natural Gas $43,167 6,206
MMBtu
TOTAL YEARLY COSTS $394,818
RECOMMENDED SAVINGS* $48,710 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,020

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Increase in Production Savings
01 2.7243: Improve air circulation with destratification fans / other methods $28,240 $65,000 $520
19,200
kWh
$720
-
kW-mo/yr
- $27,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $19,570 $69,390 $8,055
297,600
kWh
$11,515
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $450 $1,000 $795
29,440
kWh
- $(-345.0) -
04 2.4231: Reduce the pressure of compressed air to the minimum required $450 - $450
16,710
kWh
- - -
TOTAL RECOMMENDED $48,710 $135,390 $9,820
362,950
kWh
$12,235
-
kW-mo/yr
$(-345.0) $27,000
TOTAL IMPLEMENTED $20,020 $70,390 $8,850
327,040
kWh
$11,515
-
kW-mo/yr
$(-345.0) -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs