Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

599

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Folding paperboard boxes, including sanitary
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0662 #10 Y:2024 Reschedule plant operations or reduce load to avoid peaks $167,076 -
SD0662 #09 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,422 $2,278
SD0662 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $26,646 $15,968
SD0662 #07 Y:2024 Turn off equipment when not in use $30,392 $3,600
SD0662 #06 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $5,545 $8,505
SD0662 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $2,635 $3,345
SD0662 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $40,111 $7,839
SD0662 #03 Y:2024 Install direct acting units in place of compressed air pressure system in safety system $1,617 $2,200
SD0662 #02 Y:2024 Use battery storage for demand control $291,442 $26,842
SD0662 #01 Y:2024 Use solar heat to make electricty $78,473 $158,282
LE0512 #05 Y:2021 Use or replace with energy efficient substitutes $460,500 $3,500,000
LE0512 #04 Y:2021 Utilize higher efficiency lamps and/or ballasts $2,146 $7,700
LE0512 #03 Y:2021 Reduce the pressure of compressed air to the minimum required $1,086 $1,700
LE0512 #02 Y:2021 Use or replace with energy efficient substitutes $2,168 $4,000
LE0512 #01 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $3,383 $4,000
NL0026 #04 Y:2018 Reduce the pressure of compressed air to the minimum required $450 -
NL0026 #03 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $450 $1,000
NL0026 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $19,570 $69,390
NL0026 #01 Y:2018 Improve air circulation with destratification fans / other methods $28,240 $65,000
AM0764 #09 Y:2018 Make a practice of turning off lights when not needed $340 $130