Assessment Year | 2025 |
---|---|
Principal Product | Packaging |
NAICS | 322212: Folding Paperboard Box Manufacturing |
SIC | 2657: Folding Paperboard Boxes, Including Sanitary |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
116,000
ft2
|
Annual Production | 100,000,000
units
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $343,172 | 3,504,178 |
kWh
|
$0.098 |
Electricity Demand | $355,802 | 11,566 |
kW-mo/yr
|
$30.76 |
Electricity Fees | $134,881 | - |
|
- |
TOTAL YEARLY COSTS | $833,855 | |||
RECOMMENDED SAVINGS* | $645,359 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $78,473 | $158,282 |
$33,669
343,910
kWh
|
$44,804
-
kW-mo/yr
|
|
02 | 2.3141: Use battery storage for demand control | $291,442 | $26,842 |
$(-28,707.6)
(-293,234)
kWh
|
$320,150
-
kW-mo/yr
|
|
03 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $1,617 | $2,200 |
$1,617
16,521
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $40,111 | $7,839 |
$40,111
404,716
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,635 | $3,345 |
$2,635
26,925
kWh
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,545 | $8,505 |
$3,397
34,703
kWh
|
$2,148
-
kW-mo/yr
|
|
07 | 2.6218: Turn off equipment when not in use | $30,392 | $3,600 |
$25,766
263,189
kWh
|
$4,626
-
kW-mo/yr
|
|
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $26,646 | $15,968 |
$17,779
181,601
kWh
|
$8,867
-
kW-mo/yr
|
|
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,422 | $2,278 |
$871
8,898
kWh
|
$551
-
kW-mo/yr
|
|
10 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $167,076 | - | - |
$167,076
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $645,359 | $228,859 |
$97,138
987,229
kWh
|
$548,222
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs