ITAC Assessment: SD0662
ITAC logo
ITAC Assessment: SD0662
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Packaging
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 116,000
ft2
Annual Production 100,000,000
units
Production Hrs. Annual 8,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $343,172 3,504,178
kWh
Electricity Demand $355,802 11,566
kW-mo/yr
Electricity Fees $134,881 -
TOTAL YEARLY COSTS $833,855
RECOMMENDED SAVINGS* $645,359 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $78,473 $158,282 $33,669
343,910
kWh
$44,804
-
kW-mo/yr
02 2.3141: Use battery storage for demand control $291,442 $26,842 $(-28,707.6)
(-293,234)
kWh
$320,150
-
kW-mo/yr
03 2.4223: Install direct acting units in place of compressed air pressure system in safety system $1,617 $2,200 $1,617
16,521
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $40,111 $7,839 $40,111
404,716
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,635 $3,345 $2,635
26,925
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,545 $8,505 $3,397
34,703
kWh
$2,148
-
kW-mo/yr
07 2.6218: Turn off equipment when not in use $30,392 $3,600 $25,766
263,189
kWh
$4,626
-
kW-mo/yr
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,646 $15,968 $17,779
181,601
kWh
$8,867
-
kW-mo/yr
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,422 $2,278 $871
8,898
kWh
$551
-
kW-mo/yr
10 2.3131: Reschedule plant operations or reduce load to avoid peaks $167,076 - - $167,076
-
kW-mo/yr
TOTAL RECOMMENDED $645,359 $228,859 $97,138
987,229
kWh
$548,222
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs