| Assessment Year | 2000 |
|---|---|
| Principal Product | Steel Bridges |
| NAICS |
n/a
|
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $10 M to 50M |
| # of Employees | 115 |
| Plant Area |
102,000
ft2
|
| Annual Production | 20,000
ton
|
| Production Hrs. Annual | 3,744
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $55,899 | 1,584,994 |
kWh
|
$0.035 |
| Electricity Demand | $33,067 | 5,769 |
kW-mo/yr
|
$5.73 |
| Electricity Fees | $2,439 | - |
|
- |
| LPG | $2,312 | 117 |
MMBtu
|
$19.76 |
| Fuel Oil #2 | $21,858 | 3,427 |
MMBtu
|
$6.38 |
| Other Gas | $19,212 | 3,225 |
MMBtu
|
$5.96 |
| Other Energy | $33,632 | 97 |
MMBtu
|
$346.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $457,867 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $430,638 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $602 | $1,780 |
$464
12,309
kWh
|
$138
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,723 | $4,896 |
$5,646
148,593
kWh
|
$2,077
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,112 | $220 |
$2,112
36,928
kWh
|
- | - | - | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $754 | - |
$754
13,189
kWh
|
- | - | - | - | - | |
| 05 | 4.651: Install back-up equipment | $19,506 | $68,780 | - | - |
$(-247.0)
-
MMBtu
|
- | $(-2,000.0) | $21,753 | |
| 06 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $160,010 | - | - | - | - |
$160,010
-
lb
|
- | - | |
| 07 | 4.446: Automate finishing process | $159,000 | $76,000 | - | - | - | - | - | $159,000 | |
| 08 | 4.446: Automate finishing process | $108,160 | $150,150 | - | - | - | - | $108,160 | - | |
| TOTAL RECOMMENDED | $457,867 | $301,826 |
$8,976
211,019
kWh
|
$2,215
-
kW-mo/yr
|
$(-247.0)
-
MMBtu
|
$160,010
-
lb
|
$106,160 | $180,753 | ||
| TOTAL IMPLEMENTED | $430,638 | $228,150 |
$3,330
62,426
kWh
|
$138
-
kW-mo/yr
|
- |
$160,010
-
lb
|
$108,160 | $159,000 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs