matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
BD0419 #09 Y:2012 | 09 | 2012 | Install / repair insulation on steam lines | $421 | $700 | |
BD0419 #08 Y:2012 | 08 | 2012 | Utilize higher efficiency lamps and/or ballasts | $642 | $600 | |
BD0419 #07 Y:2012 | 07 | 2012 | Install compressor air intakes in coolest locations | $648 | $220 | |
BD0419 #06 Y:2012 | 06 | 2012 | Reduce the pressure of compressed air to the minimum required | $820 | $20 | |
BD0419 #05 Y:2012 | 05 | 2012 | Use synthetic lubricant | $849 | $500 | |
BD0419 #04 Y:2012 | 04 | 2012 | Install occupancy sensors | $929 | $1,200 | |
BD0419 #03 Y:2012 | 03 | 2012 | Utilize higher efficiency lamps and/or ballasts | $2,421 | $7,300 | |
BD0419 #02 Y:2012 | 02 | 2012 | Direct warmest air to combustion intake | $10,810 | $14,000 | |
BD0419 #01 Y:2012 | 01 | 2012 | Utilize higher efficiency lamps and/or ballasts | $13,031 | $31,529 | |
BD0288 #13 Y:2005 | 13 | 2005 | Use closed cycle process to minimize waste water production | $1,651 | $1,250 | |
BD0288 #12 Y:2005 | 12 | 2005 | Install occupancy sensors | $677 | $375 | |
BD0288 #11 Y:2005 | 11 | 2005 | Utilize higher efficiency lamps and/or ballasts | $1,154 | $2,480 | |
BD0288 #10 Y:2005 | 10 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,050 | $300 | |
BD0288 #09 Y:2005 | 09 | 2005 | Recover waste heat from equipment | $712 | $1,000 | |
BD0288 #08 Y:2005 | 08 | 2005 | Repair and eliminate steam leaks | $2,844 | $2,400 | |
BD0288 #07 Y:2005 | 07 | 2005 | Use most efficient type of electric motors | $4,293 | $10,160 | |
BD0288 #06 Y:2005 | 06 | 2005 | Use synthetic lubricant | $536 | $550 | |
BD0288 #05 Y:2005 | 05 | 2005 | Improve combustion control capability | $5,194 | $2,000 | |
BD0288 #04 Y:2005 | 04 | 2005 | Eliminate or reduce compressed air usage | $8,812 | $900 | |
BD0288 #03 Y:2005 | 03 | 2005 | Replace boiler | $14,342 | $2,500 |