Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paperboard mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0419 #09 Y:2012 Install / repair insulation on steam lines $421 $700
BD0419 #08 Y:2012 Utilize higher efficiency lamps and/or ballasts $642 $600
BD0419 #07 Y:2012 Install compressor air intakes in coolest locations $648 $220
BD0419 #06 Y:2012 Reduce the pressure of compressed air to the minimum required $820 $20
BD0419 #05 Y:2012 Use synthetic lubricant $849 $500
BD0419 #04 Y:2012 Install occupancy sensors $929 $1,200
BD0419 #03 Y:2012 Utilize higher efficiency lamps and/or ballasts $2,421 $7,300
BD0419 #02 Y:2012 Direct warmest air to combustion intake $10,810 $14,000
BD0419 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $13,031 $31,529
BD0288 #13 Y:2005 Use closed cycle process to minimize waste water production $1,651 $1,250
BD0288 #12 Y:2005 Install occupancy sensors $677 $375
BD0288 #11 Y:2005 Utilize higher efficiency lamps and/or ballasts $1,154 $2,480
BD0288 #10 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $1,050 $300
BD0288 #09 Y:2005 Recover waste heat from equipment $712 $1,000
BD0288 #08 Y:2005 Repair and eliminate steam leaks $2,844 $2,400
BD0288 #07 Y:2005 Use most efficient type of electric motors $4,293 $10,160
BD0288 #06 Y:2005 Use synthetic lubricant $536 $550
BD0288 #05 Y:2005 Improve combustion control capability $5,194 $2,000
BD0288 #04 Y:2005 Eliminate or reduce compressed air usage $8,812 $900
BD0288 #03 Y:2005 Replace boiler $14,342 $2,500