ITAC Assessment: IP0145
ITAC logo
ITAC Assessment: IP0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product recycled paper
NAICS 322130: Paperboard Mills
SIC 2631: Paperboard Mills
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 520,000
ft2
Annual Production 170,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,431,928 95,901,196
kWh
Electricity Demand $2,934,696 143,767
kW-mo/yr
Electricity Fees $(-322,245.0) -
Natural Gas $2,772,549 1,064,436
MMBtu
Waste Disposal Costs
Water Usage $627,642 226,275
Tgal
TOTAL YEARLY COSTS $9,444,570
RECOMMENDED SAVINGS* $346,245 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $88,444 $27,000 - - $88,444
-
MMBtu
02 2.4224: Upgrade controls on compressors $24,768 $21,741 $24,768
688,010
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,236 $12,797 $15,236
423,212
kWh
- -
04 2.3321: Use steam pressure reduction to generate power $213,186 $665,875 $119,994
3,333,180
kWh
$93,192
-
kW-mo/yr
-
05 2.2437: Recover waste heat from equipment $4,611 $17,283 $2,595
72,095
kWh
$2,016
-
kW-mo/yr
-
TOTAL RECOMMENDED $346,245 $744,696 $162,593
4,516,497
kWh
$95,208
-
kW-mo/yr
$88,444
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs