ITAC Assessment: UW2304
ITAC logo
ITAC Assessment: UW2304
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Paper (liner, board, and medium), pulp
NAICS 322121: Paper (except Newsprint) Mills
SIC 2631: Paperboard Mills
Sales Range $50
M
to 100
M
# of Employees 317
Plant Area 700,000
ft2
Annual Production 300,000
ton
Production Hrs. Annual 8,592
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,585,004 80,984,000
kWh
Electricity Demand $239,476 21,148
kW-mo/yr
Electricity Fees $(-528,220.0) -
TOTAL YEARLY COSTS $3,296,260
RECOMMENDED SAVINGS* $184,017 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $183,786

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $28,885 - $21,282
480,722
kWh
$7,603
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $5,854 $372 $4,313
97,432
kWh
$1,541
-
kW-mo/yr
-
03 2.4226: Use / purchase optimum sized compressor $148,199 $381,066 $33,177
748,915
kWh
$11,822
-
kW-mo/yr
$103,200
04 2.7142: Utilize higher efficiency lamps and/or ballasts $848 $937 $625
14,114
kWh
$223
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $231 $332 $231
5,234
kWh
- -
TOTAL RECOMMENDED $184,017 $382,707 $59,628
1,346,417
kWh
$21,189
-
kW-mo/yr
$103,200
TOTAL IMPLEMENTED $183,786 $382,375 $59,397
1,341,183
kWh
$21,189
-
kW-mo/yr
$103,200
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs