ITAC Assessment: NT0029
ITAC logo
ITAC Assessment: NT0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Linerboard
NAICS 322130: Paperboard Mills
SIC 2631: Paperboard Mills
Sales Range $100
M
to 500
M
# of Employees 160
Plant Area 2,200,000
ft2
Annual Production 275,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,966,982 106,242,169
kWh
Electricity Demand $1,218,528 170,136
kW-mo/yr
Electricity Fees $168,980 -
Natural Gas $3,395,349 927,740
MMBtu
Waste Disposal Costs
Water Usage $1,426,262 315,698
Tgal
TOTAL YEARLY COSTS $11,176,102
RECOMMENDED SAVINGS* $262,313 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,179 $5,609 $5,108
109,156
kWh
$1,071
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,227 $1,819 $6,802
145,341
kWh
$1,426
-
kW-mo/yr
-
03 2.3212: Optimize plant power factor $34,386 $117,351 - - $34,386
04 4.812: Apply for investment incentives $204,971 $10,000 - - $204,971
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,550 $21,900 $7,065
150,958
kWh
$1,485
-
kW-mo/yr
-
TOTAL RECOMMENDED $262,313 $156,678 $18,975
405,454
kWh
$3,981
-
kW-mo/yr
$239,357
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs