242
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Office furniture, except wood | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0724 #04 Y:2013 | 04 | 2013 | Use cooling tower or economizer to replace chiller cooling | $3,430 | $10,000 | |
| MA0724 #03 Y:2013 | 03 | 2013 | Optimize plant power factor | $3,816 | $5,322 | |
| MA0724 #02 Y:2013 | 02 | 2013 | Recover waste heat from equipment | $4,941 | $11,100 | |
| MA0724 #01 Y:2013 | 01 | 2013 | Use adjustable frequency drive or multiple speed motors on existing system | $17,926 | $23,600 | |
| DL0020 #06 Y:2008 | 06 | 2008 | Insulate glazing, walls, ceilings, and roofs | $63 | $130 | |
| DL0020 #05 Y:2008 | 05 | 2008 | Eliminate leaks in inert gas and compressed air lines/ valves | $740 | $350 | |
| DL0020 #04 Y:2008 | 04 | 2008 | Utilize higher efficiency lamps and/or ballasts | $12,334 | $34,037 | |
| DL0020 #03 Y:2008 | 03 | 2008 | Install vinyl strip / high speed / air curtain doors | $13,000 | $13,700 | |
| DL0020 #02 Y:2008 | 02 | 2008 | Reduce ventilation air | $29,300 | $125,000 | |
| DL0020 #01 Y:2008 | 01 | 2008 | Replace fossil fuel equipment with electrical equipment | $55,000 | $30,000 | |
| DL0005 #07 Y:2007 | 07 | 2007 | Eliminate or reduce compressed air usage | $15,951 | $80,000 | |
| DL0005 #06 Y:2007 | 06 | 2007 | Utilize higher efficiency lamps and/or ballasts | $37,314 | $108,987 | |
| DL0005 #05 Y:2007 | 05 | 2007 | Recover waste heat from equipment | $24,677 | $10,000 | |
| DL0005 #04 Y:2007 | 04 | 2007 | Insulate glazing, walls, ceilings, and roofs | $6,554 | $1,772 | |
| DL0005 #03 Y:2007 | 03 | 2007 | Install vinyl strip / high speed / air curtain doors | $92,780 | $18,375 | |
| DL0005 #02 Y:2007 | 02 | 2007 | Replace fossil fuel equipment with electrical equipment | $167,986 | $65,000 | |
| DL0005 #01 Y:2007 | 01 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $5,373 | - | |
| MA0615 #10 Y:2007 | 10 | 2007 | Analyze flue gas for proper air/fuel ratio | $2,121 | $3,200 | |
| MA0615 #09 Y:2007 | 09 | 2007 | Optimize plant power factor | $4,673 | $18,500 | |
| MA0615 #08 Y:2007 | 08 | 2007 | Replace electrically-operated equipment with fossil fuel equipment | $5,499 | $15,500 |