Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

242

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Office furniture, except wood
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0724 #04 Y:2013 Use cooling tower or economizer to replace chiller cooling $3,430 $10,000
MA0724 #03 Y:2013 Optimize plant power factor $3,816 $5,322
MA0724 #02 Y:2013 Recover waste heat from equipment $4,941 $11,100
MA0724 #01 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $17,926 $23,600
DL0020 #06 Y:2008 Insulate glazing, walls, ceilings, and roofs $63 $130
DL0020 #05 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $740 $350
DL0020 #04 Y:2008 Utilize higher efficiency lamps and/or ballasts $12,334 $34,037
DL0020 #03 Y:2008 Install vinyl strip / high speed / air curtain doors $13,000 $13,700
DL0020 #02 Y:2008 Reduce ventilation air $29,300 $125,000
DL0020 #01 Y:2008 Replace fossil fuel equipment with electrical equipment $55,000 $30,000
DL0005 #07 Y:2007 Eliminate or reduce compressed air usage $15,951 $80,000
DL0005 #06 Y:2007 Utilize higher efficiency lamps and/or ballasts $37,314 $108,987
DL0005 #05 Y:2007 Recover waste heat from equipment $24,677 $10,000
DL0005 #04 Y:2007 Insulate glazing, walls, ceilings, and roofs $6,554 $1,772
DL0005 #03 Y:2007 Install vinyl strip / high speed / air curtain doors $92,780 $18,375
DL0005 #02 Y:2007 Replace fossil fuel equipment with electrical equipment $167,986 $65,000
DL0005 #01 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $5,373 -
MA0615 #10 Y:2007 Analyze flue gas for proper air/fuel ratio $2,121 $3,200
MA0615 #09 Y:2007 Optimize plant power factor $4,673 $18,500
MA0615 #08 Y:2007 Replace electrically-operated equipment with fossil fuel equipment $5,499 $15,500