| Assessment Year | 2008 |
|---|---|
| Principal Product | Office Partitions |
| NAICS | 337215: Showcase, Partition, Shelving, and Locker Manufacturing |
| SIC | 2522: Office Furniture, Except Wood |
| Sales Range | $10 M to 50M |
| # of Employees | 58 |
| Plant Area |
80,000
ft2
|
| Annual Production | 10,000
pieces
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $132,454 | 921,409 |
kWh
|
$0.14 |
| Natural Gas | $98,719 | 10,270 |
MMBtu
|
$9.61 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $110,437 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,074 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $55,000 | $30,000 | - |
$55,000
-
MMBtu
|
|
| 02 | 2.7314: Reduce ventilation air | $29,300 | $125,000 |
$1,633
23,000
kWh
|
$27,667
-
MMBtu
|
|
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $13,000 | $13,700 | - |
$13,000
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,334 | $34,037 |
$12,334
86,252
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $740 | $350 |
$740
5,200
kWh
|
- | |
| 06 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $63 | $130 | - |
$63
-
MMBtu
|
|
| TOTAL RECOMMENDED | $110,437 | $203,217 |
$14,707
114,452
kWh
|
$95,730
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $13,074 | $34,387 |
$13,074
91,452
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs