ITAC Assessment: LS1817
ITAC logo
ITAC Assessment: LS1817
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Ship Repairing
NAICS 336611: Ship Building and Repairing
SIC 3731: Ship Building and Repairing
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 525,000
ft2
Annual Production 352
units
Production Hrs. Annual 3,640
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,903 1,237,588
kWh
Waste Disposal Costs
Water Usage $8,088 1,374
Tgal
TOTAL YEARLY COSTS $133,991
RECOMMENDED SAVINGS* $38,799 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $3,865 $315 $3,865
37,897
kWh
02 2.7135: Install occupancy sensors $794 $75 $794
7,789
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $34,054 $16,147 $34,054
333,861
kWh
04 2.7447: Install vinyl strip / high speed / air curtain doors $86 $78 $86
839
kWh
TOTAL RECOMMENDED $38,799 $16,615 $38,799
380,386
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs