Assessment Year | 2009 |
---|---|
Principal Product | Machined Castings and Forgings |
NAICS | 332710: Machine Shops |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
218,000
ft2
|
Annual Production | 100,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $222,353 | 2,709,793 |
kWh
|
$0.082 |
Natural Gas | $13,931 | 1,468 |
MMBtu
|
$9.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,901 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,891 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,898 | $14,153 |
$14,898
825
kWh
|
- | - | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $562 | $1,500 |
$562
32
kWh
|
- | - | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $5,571 | $329 |
$5,116
283
kWh
|
- | - | $455 | |
04 | 2.7135: Install occupancy sensors | $5,326 | $3,675 |
$5,326
295
kWh
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $3,020 | $1,500 |
$3,020
167
kWh
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,871 | - |
$5,871
325
kWh
|
- | - | - | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $26,653 | $48,000 | - |
$2,653
-
MMBtu
|
$24,000 | - | |
TOTAL RECOMMENDED | $61,901 | $69,157 |
$34,793
1,927
kWh
|
$2,653
-
MMBtu
|
$24,000 | $455 | ||
TOTAL IMPLEMENTED | $8,891 | $1,500 |
$8,891
492
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs