Assessment Year | 2014 |
---|---|
Principal Product | Office furniture |
NAICS | 337214: Office Furniture (except Wood) Manufacturing |
SIC | 2522: Office Furniture, Except Wood |
Sales Range | $10 M to 50M |
# of Employees | 280 |
Plant Area |
120,000
ft2
|
Annual Production | 3,825
pieces
|
Production Hrs. Annual | 4,335
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $268,262 | 2,979,200 |
kWh
|
$0.090 |
Electricity Demand | $69,759 | 7,751 |
kW-mo/yr
|
$9.00 |
Electricity Fees | $(-769.0) | - |
|
- |
Natural Gas | $258,893 | 32,744 |
MMBtu
|
$7.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,434 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,247 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,926 | $23,600 |
$17,926
199,181
kWh
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $4,941 | $11,100 | - | - |
$4,941
-
MMBtu
|
|
03 | 2.3212: Optimize plant power factor | $3,816 | $5,322 | - |
$3,816
-
kW-mo/yr
|
- | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,430 | $10,000 |
$3,430
38,107
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,321 | $1,500 |
$2,321
25,788
kWh
|
- | - | |
TOTAL RECOMMENDED | $32,434 | $51,522 |
$23,677
263,076
kWh
|
$3,816
-
kW-mo/yr
|
$4,941
-
MMBtu
|
||
TOTAL IMPLEMENTED | $20,247 | $25,100 |
$20,247
224,969
kWh
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs