ITAC Assessment: MA0724
ITAC logo
ITAC Assessment: MA0724
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Office furniture
NAICS 337214: Office Furniture (except Wood) Manufacturing
SIC 2522: Office Furniture, Except Wood
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area 120,000
ft2
Annual Production 3,825
pieces
Production Hrs. Annual 4,335
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $268,262 2,979,200
kWh
Electricity Demand $69,759 7,751
kW-mo/yr
Electricity Fees $(-769.0) -
Natural Gas $258,893 32,744
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,434 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,247

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,926 $23,600 $17,926
199,181
kWh
- -
02 2.2437: Recover waste heat from equipment $4,941 $11,100 - - $4,941
-
MMBtu
03 2.3212: Optimize plant power factor $3,816 $5,322 - $3,816
-
kW-mo/yr
-
04 2.2614: Use cooling tower or economizer to replace chiller cooling $3,430 $10,000 $3,430
38,107
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,321 $1,500 $2,321
25,788
kWh
- -
TOTAL RECOMMENDED $32,434 $51,522 $23,677
263,076
kWh
$3,816
-
kW-mo/yr
$4,941
-
MMBtu
TOTAL IMPLEMENTED $20,247 $25,100 $20,247
224,969
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs