ITAC Assessment: DL0005
ITAC logo
ITAC Assessment: DL0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Shelving, SOHO Cabinets, Lateral File Cabinet
NAICS 337214: Office Furniture (except Wood) Manufacturing
SIC 2522: Office Furniture, Except Wood
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 88,660
ft2
Annual Production 1,718,400
pieces
Production Hrs. Annual 8,500
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $561,708 37,865
kWh
Electricity Demand $73,777 876
kW-mo/yr
Natural Gas $561,708 37,865
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $350,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $310,007

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,373 - $5,373
40,250
kWh
-
02 2.1321: Replace fossil fuel equipment with electrical equipment $167,986 $65,000 - $167,986
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $92,780 $18,375 - $92,780
-
MMBtu
04 2.7491: Insulate glazing, walls, ceilings, and roofs $6,554 $1,772 - $6,554
-
MMBtu
05 2.2437: Recover waste heat from equipment $24,677 $10,000 - $24,677
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $37,314 $108,987 $37,314
357,847
kWh
-
07 2.4239: Eliminate or reduce compressed air usage $15,951 $80,000 $15,951
187,480
kWh
-
TOTAL RECOMMENDED $350,635 $284,134 $58,638
585,577
kWh
$291,997
-
MMBtu
TOTAL IMPLEMENTED $310,007 $194,134 $42,687
398,097
kWh
$267,320
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs