| Assessment Year | 2007 |
|---|---|
| Principal Product | Shelving, SOHO Cabinets, Lateral File Cabinet |
| NAICS | 337214: Office Furniture (except Wood) Manufacturing |
| SIC | 2522: Office Furniture, Except Wood |
| Sales Range | $50 M to 100M |
| # of Employees | 120 |
| Plant Area |
88,660
ft2
|
| Annual Production | 1,718,400
pieces
|
| Production Hrs. Annual | 8,500
hrs
|
| Location (State) | Delaware |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $561,708 | 37,865 |
kWh
|
$14.83 |
| Electricity Demand | $73,777 | 876 |
kW-mo/yr
|
$84.22 |
| Natural Gas | $561,708 | 37,865 |
MMBtu
|
$14.83 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $350,635 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $310,007 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,373 | - |
$5,373
40,250
kWh
|
- | |
| 02 | 2.1321: Replace fossil fuel equipment with electrical equipment | $167,986 | $65,000 | - |
$167,986
-
MMBtu
|
|
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $92,780 | $18,375 | - |
$92,780
-
MMBtu
|
|
| 04 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $6,554 | $1,772 | - |
$6,554
-
MMBtu
|
|
| 05 | 2.2437: Recover waste heat from equipment | $24,677 | $10,000 | - |
$24,677
-
MMBtu
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $37,314 | $108,987 |
$37,314
357,847
kWh
|
- | |
| 07 | 2.4239: Eliminate or reduce compressed air usage | $15,951 | $80,000 |
$15,951
187,480
kWh
|
- | |
| TOTAL RECOMMENDED | $350,635 | $284,134 |
$58,638
585,577
kWh
|
$291,997
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $310,007 | $194,134 |
$42,687
398,097
kWh
|
$267,320
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs