Assessment Year | 2007 |
---|---|
Principal Product | Consoles, enclosures, office & technical furniture |
NAICS | 337214: Office Furniture (except Wood) Manufacturing |
SIC | 2522: Office Furniture, Except Wood |
Sales Range | $50 M to 100M |
# of Employees | 327 |
Plant Area |
460,320
ft2
|
Annual Production | 16,000,000
lb
|
Production Hrs. Annual | 4,600
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $766,338 | 6,024,000 |
kWh
|
$0.13 |
Electricity Demand | $86,293 | 16,920 |
kW-mo/yr
|
$5.10 |
Natural Gas | $418,680 | 31,868 |
MMBtu
|
$13.14 |
Fuel Oil #2 | $80,194 | 5,558 |
MMBtu
|
$14.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $172,520 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $109,410 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $57,604 | $84,300 |
$53,326
380,900
kWh
|
$4,278
-
kW-mo/yr
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $44,050 | $100,800 |
$27,370
195,500
kWh
|
- |
$16,680
-
MMBtu
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $15,125 | - |
$14,000
100,000
kWh
|
$1,125
-
kW-mo/yr
|
- | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $13,561 | $53,848 |
$(-9,604.0)
(-68,600)
kWh
|
$(-832.0)
-
kW-mo/yr
|
$23,997
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,214 | $800 |
$11,214
80,100
kWh
|
- | - | - | |
06 | 2.2531: Re-size charging openings or add movable cover or door | $10,518 | $13,000 | - | - |
$10,518
-
MMBtu
|
- | |
07 | 2.6218: Turn off equipment when not in use | $8,155 | - |
$7,770
55,500
kWh
|
$385
-
kW-mo/yr
|
- | - | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,499 | $15,500 |
$6,286
44,900
kWh
|
$958
-
kW-mo/yr
|
$(-1,745.0)
-
MMBtu
|
- | |
09 | 2.3212: Optimize plant power factor | $4,673 | $18,500 | - |
$4,673
-
kW-mo/yr
|
- | - | |
10 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,121 | $3,200 | - | - | - |
$2,121
-
MMBtu
|
|
TOTAL RECOMMENDED | $172,520 | $289,948 |
$110,362
788,300
kWh
|
$10,587
-
kW-mo/yr
|
$49,450
-
MMBtu
|
$2,121
-
MMBtu
|
||
TOTAL IMPLEMENTED | $109,410 | $119,800 |
$86,310
616,500
kWh
|
$10,461
-
kW-mo/yr
|
$10,518
-
MMBtu
|
$2,121
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs