ITAC Assessment: MA0615
ITAC logo
ITAC Assessment: MA0615
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Consoles, enclosures, office & technical furniture
NAICS 337214: Office Furniture (except Wood) Manufacturing
SIC 2522: Office Furniture, Except Wood
Sales Range $50
M
to 100
M
# of Employees 327
Plant Area 460,320
ft2
Annual Production 16,000,000
lb
Production Hrs. Annual 4,600
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $766,338 6,024,000
kWh
Electricity Demand $86,293 16,920
kW-mo/yr
Natural Gas $418,680 31,868
MMBtu
Fuel Oil #2 $80,194 5,558
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $172,520 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $109,410

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $57,604 $84,300 $53,326
380,900
kWh
$4,278
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $44,050 $100,800 $27,370
195,500
kWh
- $16,680
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $15,125 - $14,000
100,000
kWh
$1,125
-
kW-mo/yr
- -
04 2.2414: Use waste heat from hot flue gases to preheat $13,561 $53,848 $(-9,604.0)
(-68,600)
kWh
$(-832.0)
-
kW-mo/yr
$23,997
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,214 $800 $11,214
80,100
kWh
- - -
06 2.2531: Re-size charging openings or add movable cover or door $10,518 $13,000 - - $10,518
-
MMBtu
-
07 2.6218: Turn off equipment when not in use $8,155 - $7,770
55,500
kWh
$385
-
kW-mo/yr
- -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,499 $15,500 $6,286
44,900
kWh
$958
-
kW-mo/yr
$(-1,745.0)
-
MMBtu
-
09 2.3212: Optimize plant power factor $4,673 $18,500 - $4,673
-
kW-mo/yr
- -
10 2.1233: Analyze flue gas for proper air/fuel ratio $2,121 $3,200 - - - $2,121
-
MMBtu
TOTAL RECOMMENDED $172,520 $289,948 $110,362
788,300
kWh
$10,587
-
kW-mo/yr
$49,450
-
MMBtu
$2,121
-
MMBtu
TOTAL IMPLEMENTED $109,410 $119,800 $86,310
616,500
kWh
$10,461
-
kW-mo/yr
$10,518
-
MMBtu
$2,121
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs