Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

273

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Mattresses, foundations, and convertible beds
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0344 #10 Y:2026 Keep doors and windows shut when not on use $16 -
IC0344 #09 Y:2026 Use or replace with energy efficient substitutes $13,246 $50,000
IC0344 #08 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $2,895 $20,600
IC0344 #07 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $319 $548
IC0344 #06 Y:2026 Install / repair insulation on steam lines $954 $1,353
IC0344 #05 Y:2026 Insulate feedwater tank $551 $660
IC0344 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,531 $1,604
IC0344 #03 Y:2026 Upgrade controls on compressors $12,669 $3,021
IC0344 #02 Y:2026 Use battery storage for demand control $23,871 $30,729
IC0344 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $348 -
UD1115 #06 Y:2025 Install compressor air intakes in coolest locations $1,479 $1,015
UD1115 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $2,587 $5,423
UD1115 #04 Y:2025 Insulate bare equipment $892 $1,267
UD1115 #03 Y:2025 Meter recycled water (to reduce sewer charges) $1,016 $760
UD1115 #02 Y:2025 Optimize plant power factor $2,927 $3,700
UD1115 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $25,515 $7,035
MS0438 #03 Y:2024 Lower temperature during the winter season and vice-versa $105 -
MS0438 #02 Y:2024 Install occupancy sensors $419 $956
MS0438 #01 Y:2024 Use solar heat to make electricty $28,668 $282,366
GT0979 #06 Y:2024 Use solar heat to make electricty $105,447 $2,259,869