Assessment Year | 2019 |
---|---|
Principal Product | Mattresses |
NAICS | 337910: Mattress Manufacturing |
SIC | 2515: Mattresses, Foundations, and Convertible Beds |
Sales Range | $10 M to 50M |
# of Employees | 135 |
Plant Area |
234,000
ft2
|
Annual Production | 520,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $134,022 | 3,031,960 |
kWh
|
$0.044 |
Electricity Demand | $71,226 | 5,374 |
kW-mo/yr
|
$13.25 |
Electricity Fees | $45,698 | - |
|
- |
TOTAL YEARLY COSTS | $250,946 | |||
RECOMMENDED SAVINGS* | $136,070 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $70,297 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $61,551 | $246,817 |
$43,539
989,531
kWh
|
$18,012
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38,089 | $74,297 |
$24,119
548,155
kWh
|
$13,970
-
kW-mo/yr
|
- | |
03 | 2.6218: Turn off equipment when not in use | $22,037 | $3,600 |
$22,037
500,833
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,025 | $120 |
$5,679
129,062
kWh
|
$2,346
-
kW-mo/yr
|
- | |
05 | 4.821: Pay bills on time to avoid late fees | $2,859 | - | - | - | $2,859 | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,363 | $2,005 |
$859
19,514
kWh
|
$504
-
kW-mo/yr
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,145 | $1,980 |
$814
18,506
kWh
|
$331
-
kW-mo/yr
|
- | |
08 | 2.6127: Maintain air filters by cleaning or replacement | $1,001 | $240 |
$630
14,307
kWh
|
$371
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $136,070 | $329,059 |
$97,677
2,219,908
kWh
|
$35,534
-
kW-mo/yr
|
$2,859 | ||
TOTAL IMPLEMENTED | $70,297 | $80,237 |
$53,279
1,210,863
kWh
|
$17,018
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs