ITAC Assessment: MI0363
ITAC logo
ITAC Assessment: MI0363
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Mattresses
NAICS 337910: Mattress Manufacturing
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 234,000
ft2
Annual Production 520,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,022 3,031,960
kWh
Electricity Demand $71,226 5,374
kW-mo/yr
Electricity Fees $45,698 -
TOTAL YEARLY COSTS $250,946
RECOMMENDED SAVINGS* $136,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,297

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7232: Replace existing hvac unit with high efficiency model $61,551 $246,817 $43,539
989,531
kWh
$18,012
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $38,089 $74,297 $24,119
548,155
kWh
$13,970
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $22,037 $3,600 $22,037
500,833
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $8,025 $120 $5,679
129,062
kWh
$2,346
-
kW-mo/yr
-
05 4.821: Pay bills on time to avoid late fees $2,859 - - - $2,859
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,363 $2,005 $859
19,514
kWh
$504
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,145 $1,980 $814
18,506
kWh
$331
-
kW-mo/yr
-
08 2.6127: Maintain air filters by cleaning or replacement $1,001 $240 $630
14,307
kWh
$371
-
kW-mo/yr
-
TOTAL RECOMMENDED $136,070 $329,059 $97,677
2,219,908
kWh
$35,534
-
kW-mo/yr
$2,859
TOTAL IMPLEMENTED $70,297 $80,237 $53,279
1,210,863
kWh
$17,018
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs