ITAC Assessment: MA0021
ITAC logo
ITAC Assessment: MA0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product THERMOSET PLASTICS
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area
n/a
Annual Production 5,250,000
lb
Production Hrs. Annual 5,880
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,690 579,132
kWh
Natural Gas $5,318 758
MMBtu
Wood $638 731
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,628 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,286

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6124: Establish equipment maintenance schedule $454 - - $659
-
MMBtu
$(-205.0)
02 3.6123: Burn wood by-products for heat $2,010 $8,450 - $2,215
-
MMBtu
$(-205.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,822 $105 $1,822
22,567
kWh
- -
04 2.7229: Air condition only space necessary $435 $100 - $435
-
MMBtu
-
05 2.2437: Recover waste heat from equipment $2,005 $3,702 - $2,005
-
MMBtu
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,902 $4,380 $3,902
48,359
kWh
- -
TOTAL RECOMMENDED $10,628 $16,737 $5,724
70,926
kWh
$5,314
-
MMBtu
$(-410.0)
TOTAL IMPLEMENTED $4,286 $8,555 $1,822
22,567
kWh
$2,874
-
MMBtu
$(-410.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs