ITAC Assessment: GT0979
ITAC logo
ITAC Assessment: GT0979
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Foam Mattresses
NAICS 337910: Mattress Manufacturing
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $10
M
to 50
M
# of Employees 114
Plant Area 1,000,000
ft2
Annual Production 540,000
units
Production Hrs. Annual 2,340
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $311,677 5,133,876
kWh
Electricity Fees $23,279 -
Natural Gas $100,904 5,882
MMBtu
Other Gas $7,475 1
MMBtu
TOTAL YEARLY COSTS $443,335
RECOMMENDED SAVINGS* $165,744 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $12,666 $200 - - $12,666
02 2.8121: Apply for tax-free status for energy purchases $26,554 $800 - $26,554 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,807 $1,850 $20,707
339,456
kWh
- $(-2,900.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,122 $800 $3,122
51,177
kWh
- -
05 2.4239: Eliminate or reduce compressed air usage $148 $100 $148
2,431
kWh
- -
06 2.9114: Use solar heat to make electricty $105,447 $2,259,869 $105,447
1,736,903
kWh
- -
TOTAL RECOMMENDED $165,744 $2,263,619 $129,424
2,129,967
kWh
$26,554 $9,766
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs