Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Nailed and lock corner wood boxes and shook
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0636 #04 Y:2019 Replace electric motors with back pressure steam turbines and use exhaust steam for process heat $27,892 $85,000
NC0636 #03 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $184 $60
NC0636 #02 Y:2019 Install occupancy sensors $362 $871
NC0636 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $8,929 $16,627
SF0240 #06 Y:2002 Increase amount of waste recovered for resale $65,251 $89,870
SF0240 #05 Y:2002 Reuse / recycle/ sell rubber products $2,535 -
SF0240 #04 Y:2002 Use photocell controls $1,670 $5,520
SF0240 #03 Y:2002 Utilize higher efficiency lamps and/or ballasts $6,387 $11,900
SF0240 #02 Y:2002 Upgrade controls on compressors $4,370 $3,332
SF0240 #01 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $1,486 -
ND0220 #08 Y:1995 Turn off equipment when not in use $87 -
ND0220 #07 Y:1995 Close holes and openings in building such as broken windows $117 $70
ND0220 #06 Y:1995 Utilize higher efficiency lamps and/or ballasts $127 $190
ND0220 #05 Y:1995 Install compressor air intakes in coolest locations $341 $100
ND0220 #04 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $1,167 $400
ND0220 #03 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,400 $374
ND0220 #02 Y:1995 Optimize plant power factor $1,783 $2,145
ND0220 #01 Y:1995 Use most efficient type of electric motors $3,210 $2,390
AM0181 #04 Y:1993 Eliminate leaks in inert gas and compressed air lines/ valves $820 $420
AM0181 #03 Y:1993 Size electric motors for peak operating efficiency $1,042 $2,250