ITAC Assessment: AM0181
ITAC logo
ITAC Assessment: AM0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product wooden crates and boxes
NAICS
n/a
SIC 2441: Nailed and Lock Corner Wood Boxes and Shook
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 94,336
ft2
Annual Production 1,080
thousand feet
Production Hrs. Annual 2,277
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,583 725,674
kWh
Natural Gas $279 16
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,072 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,030

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3212: Optimize plant power factor $3,000 $6,000 $3,000
-
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,210 $9,440 $2,210
42,204
kWh
03 2.4131: Size electric motors for peak operating efficiency $1,042 $2,250 $1,042
-
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $820 $420 $820
16,120
kWh
TOTAL RECOMMENDED $7,072 $18,110 $7,072
58,324
kWh
TOTAL IMPLEMENTED $6,030 $15,860 $6,030
58,324
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs