ITAC Assessment: HO0121
ITAC logo
ITAC Assessment: HO0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Color Concentrates
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 50,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,992 1,514,361
kWh
Natural Gas $18,059 2,666
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,858 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,138

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,913 $2,160 $3,913
27,843
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,437 $2,318 $1,437
10,258
kWh
-
03 2.4133: Use most efficient type of electric motors $739 $598 $739
5,275
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,049 $160 $5,049
35,756
kWh
-
05 3.5315: Lease / purchase baler; sell cardboard to recycler $720 $5,000 - $720
-
lb
TOTAL RECOMMENDED $11,858 $10,236 $11,138
79,132
kWh
$720
-
lb
TOTAL IMPLEMENTED $11,138 $5,236 $11,138
79,132
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs