ITAC Assessment: KU0448
ITAC logo
ITAC Assessment: KU0448
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product residential gas meters
NAICS
n/a
SIC 3824: Totalizing Fluid Meters and Counting Devices
Sales Range $50
M
to 100
M
# of Employees 600
Plant Area 110,000
ft2
Annual Production 1,200,000
pieces
Production Hrs. Annual 5,520
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $401,610 11,811,548
kWh
Natural Gas $524,106 106,013
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,801 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,025

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $40,898 $13,400 - $40,898
-
MMBtu
02 2.2443: Re-use or recycle hot or cold process exhaust air $11,016 $10,390 - $11,016
-
MMBtu
03 2.2443: Re-use or recycle hot or cold process exhaust air $7,469 $12,750 - $7,469
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $2,612 $462 $2,612
76,788
kWh
-
05 2.2511: Insulate bare equipment $1,200 $2,295 - $1,200
-
MMBtu
06 2.2514: Cover open tanks $99 $350 - $99
-
MMBtu
07 2.7135: Install occupancy sensors $2,094 $1,800 $2,094
61,547
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $413 $720 $413
4,103
kWh
-
TOTAL RECOMMENDED $65,801 $42,167 $5,119
142,438
kWh
$60,682
-
MMBtu
TOTAL IMPLEMENTED $3,025 $1,182 $3,025
80,891
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs