ITAC Assessment: WV0091
ITAC logo
ITAC Assessment: WV0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Lumber Products
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 45,000
ft2
Annual Production 13,000
thousand feet
Production Hrs. Annual 4,335
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,845 2,528,429
kWh
Electricity Fees $378 -
Natural Gas $39,180 7,261
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,047 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,183

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $61 $43 $61
1,465
kWh
- -
02 2.4133: Use most efficient type of electric motors $833 $3,726 $833
19,343
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,048 $3,200 $5,048
117,233
kWh
- -
04 2.4131: Size electric motors for peak operating efficiency $10,600 $16,000 $10,600
246,483
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $84 $210 $84
1,758
kWh
- -
06 2.4314: Use synthetic lubricant $357 $350 $357
11,723
kWh
- -
07 2.2136: Install / repair insulation on steam lines $264 $220 - $264
-
MMBtu
-
08 3.5313: Increase amount of waste recovered for resale $8,800 - - - $8,800
TOTAL RECOMMENDED $26,047 $23,749 $16,983
398,005
kWh
$264
-
MMBtu
$8,800
TOTAL IMPLEMENTED $15,183 $7,529 $6,383
151,522
kWh
- $8,800
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs