ITAC Assessment: NC0636
ITAC logo
ITAC Assessment: NC0636
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Wood boxes
NAICS 321920: Wood Container and Pallet Manufacturing
SIC 2441: Nailed and Lock Corner Wood Boxes and Shook
Sales Range $50
M
to 100
M
# of Employees 105
Plant Area 152,000
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,855 1,717,095
kWh
Electricity Demand $63,850 7,599
kW-mo/yr
Wood $1 57,375
MMBtu
TOTAL YEARLY COSTS $164,706
RECOMMENDED SAVINGS* $37,367 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,113

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,929 $16,627 $6,246
106,410
kWh
$2,683
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $362 $871 $362
6,171
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $184 $60 $129
2,190
kWh
$55
-
kW-mo/yr
-
04 2.3411: Replace electric motors with back pressure steam turbines and use exhaust steam for process heat $27,892 $85,000 $23,010
392,000
kWh
$9,882
-
kW-mo/yr
$(-5,000.0)
TOTAL RECOMMENDED $37,367 $102,558 $29,747
506,771
kWh
$12,620
-
kW-mo/yr
$(-5,000.0)
TOTAL IMPLEMENTED $9,113 $16,687 $6,375
108,600
kWh
$2,738
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs