| Assessment Year | 1982 |
|---|---|
| Principal Product | TWO-LITER BEVERAGE BOTTLES |
| NAICS |
n/a
|
| SIC | 3085: Plastics Bottles |
| Sales Range | $10 M to 50M |
| # of Employees | 155 |
| Plant Area |
n/a
|
| Annual Production | 72,000,000
pieces
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $618,129 | 18,793,670 |
kWh
|
$0.033 |
| Natural Gas | $36,157 | 14,379 |
MMBtu
|
$2.51 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $177,918 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,246 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4322: Use or replace with energy efficient substitutes | $133,013 | $240,000 |
$133,013
4,043,963
kWh
|
- | |
| 02 | 2.7224: Reduce space conditioning during non-working hours | $27,871 | - |
$302
9,086
kWh
|
$27,569
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,358 | $11,910 |
$8,358
254,103
kWh
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,428 | $5,000 | - |
$5,428
-
MMBtu
|
|
| 05 | 2.2515: Use optimum thickness insulation | $1,888 | $880 |
$1,888
57,444
kWh
|
- | |
| 06 | 2.4322: Use or replace with energy efficient substitutes | $1,360 | - |
$1,360
41,325
kWh
|
- | |
| TOTAL RECOMMENDED | $177,918 | $257,790 |
$144,921
4,405,921
kWh
|
$32,997
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,246 | $12,790 |
$10,246
311,547
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs