Assessment Year | 2011 |
---|---|
Principal Product | Electrical wiring devices |
NAICS | 335931: Current-Carrying Wiring Device Manufacturing |
SIC | 3643: Current-Carrying Wiring Devices |
Sales Range | $50 M to 100M |
# of Employees | 319 |
Plant Area |
240,000
ft2
|
Annual Production | 147,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,079,930 | 24,218,579 |
kWh
|
$0.045 |
Electricity Demand | $488,509 | 52,462 |
kW-mo/yr
|
$9.31 |
Electricity Fees | $3,189 | - |
|
- |
Natural Gas | $56,695 | 7,393 |
MMBtu
|
$7.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,739 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,590 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,839 | - |
$8,993
164,640
kWh
|
$846
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,052 | $100 |
$5,119
93,720
kWh
|
$613
-
kW-mo/yr
|
- | $(-1,200.0) | $(-480.0) | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $1,314 | $150 |
$1,161
21,250
kWh
|
$153
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $11,250 | $22,950 |
$11,395
208,620
kWh
|
$1,502
-
kW-mo/yr
|
- | - | - |
$(-1,647.0)
-
Tgal
|
|
05 | 2.1224: Replace boiler | $3,539 | $11,800 | - | - |
$3,539
-
MMBtu
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,385 | $4,833 |
$1,076
19,695
kWh
|
$309
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $30,360 | $161,900 |
$35,791
655,268
kWh
|
- | - | - | - |
$(-5,431.0)
-
Tgal
|
|
TOTAL RECOMMENDED | $61,739 | $201,733 |
$63,535
1,163,193
kWh
|
$3,423
-
kW-mo/yr
|
$3,539
-
MMBtu
|
$(-1,200.0) | $(-480.0) |
$(-7,078.0)
-
Tgal
|
||
TOTAL IMPLEMENTED | $16,590 | $5,083 |
$16,349
299,305
kWh
|
$1,921
-
kW-mo/yr
|
- | $(-1,200.0) | $(-480.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs