ITAC Assessment: UF0347
ITAC logo
ITAC Assessment: UF0347
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Livestock Feed
NAICS 115114: Postharvest Crop Activities (except Cotton Ginning)
SIC 723: Beauty Shops
Sales Range less than $500
k
# of Employees 90
Plant Area 52,500
ft2
Annual Production 0
ton
Production Hrs. Annual 4,680
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,940 1,973,286
kWh
Electricity Demand $49,368 7,102
kW-mo/yr
Natural Gas $46,902 5,067
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,793 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $5,948 $9,014 $3,613
65,687
kWh
$2,335
-
kW-mo/yr
-
02 2.1213: Direct warmest air to combustion intake $4,683 $24,500 - - $4,683
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,477 $23,746 $6,391
116,192
kWh
$3,086
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,920 $1,902 $1,450
30,608
kWh
$470
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,256 - $2,256
27,378
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,861 - $1,861
12,508
kWh
- -
07 2.7124: Make a practice of turning off lights when not needed $4,852 $1,004 $4,572
83,123
kWh
$280
-
kW-mo/yr
-
08 2.7131: Add area lighting switches $1,051 $3,395 $1,051
12,737
kWh
- -
09 2.2135: Repair and eliminate steam leaks $2,746 $800 - - $2,746
-
MMBtu
TOTAL RECOMMENDED $34,793 $64,361 $21,193
348,233
kWh
$6,171
-
kW-mo/yr
$7,429
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs