ITAC Assessment: SF0240
ITAC logo
ITAC Assessment: SF0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Wooden packaging crates
NAICS
n/a
SIC 2441: Nailed and Lock Corner Wood Boxes and Shook
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 82,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 6,396
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,243 745,680
kWh
Natural Gas $1,451 115
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,699 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,737

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,486 - $1,486
13,697
kWh
-
02 2.4224: Upgrade controls on compressors $4,370 $3,332 $4,370
31,588
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,387 $11,900 $6,387
45,763
kWh
-
04 2.7134: Use photocell controls $1,670 $5,520 $1,670
11,954
kWh
-
05 3.5218: Reuse / recycle/ sell rubber products $2,535 - - $2,535
-
lb
06 3.5313: Increase amount of waste recovered for resale $65,251 $89,870 - $65,251
-
lb
TOTAL RECOMMENDED $81,699 $110,622 $13,913
103,002
kWh
$67,786
-
lb
TOTAL IMPLEMENTED $66,737 $89,870 $1,486
13,697
kWh
$65,251
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs