Assessment Year | 1996 |
---|---|
Principal Product | Double-wide manufactured homes |
NAICS |
n/a
|
SIC | 2451: Mobile Homes |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
131,250
ft2
|
Annual Production | 1,800
units
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $58,267 | 1,021,688 |
kWh
|
$0.057 |
Electricity Demand | $31,499 | 3,891 |
kW-mo/yr
|
$8.10 |
Electricity Fees | $(-2,037.0) | - |
|
- |
Natural Gas | $23,745 | 6,603 |
MMBtu
|
$3.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,547 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,867 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $525 | $200 |
$525
8,499
kWh
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $680 | $907 |
$301
5,275
kWh
|
$174
-
kW-mo/yr
|
$205 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $362 | $210 |
$220
3,810
kWh
|
$120
-
kW-mo/yr
|
$22 | - | |
04 | 2.7135: Install occupancy sensors | $322 | $200 |
$322
3,810
kWh
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,650 | $480 |
$6,650
75,615
kWh
|
- | - | - | |
06 | 3.4154: Eliminate leaks in water lines and valves | $8 | $70 | - | - | - |
$8
-
Tgal
|
|
TOTAL RECOMMENDED | $8,547 | $2,067 |
$8,018
97,009
kWh
|
$294
-
kW-mo/yr
|
$227 |
$8
-
Tgal
|
||
TOTAL IMPLEMENTED | $7,867 | $1,160 |
$7,717
91,734
kWh
|
$120
-
kW-mo/yr
|
$22 |
$8
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs