ITAC Assessment: MO0076
ITAC logo
ITAC Assessment: MO0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Farm Machinery and Steel Spring Part
NAICS
n/a
SIC 3493: Steel Springs, Except Wire
Sales Range $5
M
to 10
M
# of Employees 63
Plant Area 125,000
ft2
Annual Production 2,600
pieces
Production Hrs. Annual 4,046
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,650 1,255,569
kWh
Natural Gas $89,683 40,383
MMBtu
LPG $3,786 443
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,738 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,422

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $718 $219 $718
8,499
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,324 $3,981 $1,324
15,533
kWh
03 2.2437: Recover waste heat from equipment $4,492 $7,920 $4,492
592,907
kWh
04 2.4133: Use most efficient type of electric motors $1,747 $4,462 $1,747
20,516
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,316 $735 $1,316
15,533
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,141 $318 $1,141
13,482
kWh
TOTAL RECOMMENDED $10,738 $17,635 $10,738
666,470
kWh
TOTAL IMPLEMENTED $9,422 $16,900 $9,422
650,937
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs