ITAC Assessment: UD0206
ITAC logo
ITAC Assessment: UD0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PLASTIC PIPE & PIPE FITTINGS
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 156
Plant Area
n/a
Annual Production 22,000,000
lb
Production Hrs. Annual 8,544
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $832,605 15,645,076
kWh
LPG $44,321 4,055
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,814 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,814

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3191: Use demand controller or load shedder $4,458 $1,000 $4,458
-
kWh
02 2.2437: Recover waste heat from equipment $632 $1,000 $632
12,016
kWh
03 2.7141: Lower light fixtures in high ceiling areas $11,724 $17,000 $11,724
257,327
kWh
TOTAL RECOMMENDED $16,814 $19,000 $16,814
269,343
kWh
TOTAL IMPLEMENTED $16,814 $19,000 $16,814
269,343
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs