ITAC Assessment: UU0163
ITAC logo
ITAC Assessment: UU0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Water Distribution
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 17
Plant Area 175,000
ft2
Annual Production 6,775,415
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $289,744 5,031,869
kWh
Electricity Demand $254,622 19,154
kW-mo/yr
Electricity Fees $49,778 -
Waste Disposal Costs
Water Usage $10,103,189 6,054,425
Tgal
TOTAL YEARLY COSTS $10,697,333
RECOMMENDED SAVINGS* $101,046 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,790

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.3322: Use existing dam to generate electricity $38,699 $100,000 $38,699
350,400
kWh
- -
02 2.8114: Change rate schedules or other changes in utility service $29,850 $1,200 - - $29,850
03 4.212: Adopt in-house material generation $11,324 $5,000 $106
2,896
kWh
- $11,218
04 2.3212: Optimize plant power factor $4,707 $8,012 - - $4,707
05 2.7221: Lower temperature during the winter season and vice-versa $4,576 $2,000 $4,576
121,925
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,414 $15,055 $217
3,750
kWh
$1,196
-
kW-mo/yr
-
07 4.212: Adopt in-house material generation $10,477 $5,000 - - $10,477
TOTAL RECOMMENDED $101,046 $136,267 $43,598
478,971
kWh
$1,196
-
kW-mo/yr
$56,252
TOTAL IMPLEMENTED $27,790 $27,055 $4,899
128,571
kWh
$1,196
-
kW-mo/yr
$21,695
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs