| Assessment Year | 2020 |
|---|---|
| Principal Product | Water Distribution |
| NAICS | 221310: Water Supply and Irrigation Systems |
| SIC | 4941: Water Supply |
| Sales Range | $10 M to 50M |
| # of Employees | 17 |
| Plant Area |
175,000
ft2
|
| Annual Production | 6,775,415
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $289,744 | 5,031,869 |
kWh
|
$0.058 | |
| Electricity Demand | $254,622 | 19,154 |
kW-mo/yr
|
$13.29 | |
| Electricity Fees | $49,778 | - |
|
- | |
| Waste Disposal Costs | |||||
| Water Usage | $10,103,189 | 6,054,425 |
Tgal
|
$1.67 | |
| TOTAL YEARLY COSTS | $10,697,333 | ||||
| RECOMMENDED SAVINGS* | $101,046 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $27,790 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3322: Use existing dam to generate electricity | $38,699 | $100,000 |
$38,699
350,400
kWh
|
- | - | |
| 02 | 2.8114: Change rate schedules or other changes in utility service | $29,850 | $1,200 | - | - | $29,850 | |
| 03 | 4.212: Adopt in-house material generation | $11,324 | $5,000 |
$106
2,896
kWh
|
- | $11,218 | |
| 04 | 2.3212: Optimize plant power factor | $4,707 | $8,012 | - | - | $4,707 | |
| 05 | 2.7221: Lower temperature during the winter season and vice-versa | $4,576 | $2,000 |
$4,576
121,925
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,414 | $15,055 |
$217
3,750
kWh
|
$1,196
-
kW-mo/yr
|
- | |
| 07 | 4.212: Adopt in-house material generation | $10,477 | $5,000 | - | - | $10,477 | |
| TOTAL RECOMMENDED | $101,046 | $136,267 |
$43,598
478,971
kWh
|
$1,196
-
kW-mo/yr
|
$56,252 | ||
| TOTAL IMPLEMENTED | $27,790 | $27,055 |
$4,899
128,571
kWh
|
$1,196
-
kW-mo/yr
|
$21,695 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs