Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

386

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Hardwood veneer and plywood
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0564 #01 Y:2010 Install soft-start to eliminate nuisance trips $11,375 $32,340
OR0555 #04 Y:2010 Utilize energy-efficient belts and other improved mechanisms $2,054 $1
OR0555 #03 Y:2010 Remove or close off unneeded compressed air lines $15,978 $11,900
OR0555 #02 Y:2010 Install smaller boiler (increase high fire duty cycle) $32,115 $37,100
OR0555 #01 Y:2010 Improve combustion control capability $257,883 $405,450
WV0399 #13 Y:2009 Utilize higher efficiency lamps and/or ballasts $1,498 $4,153
WV0399 #12 Y:2009 Reduce the pressure of compressed air to the minimum required $2,246 $26
WV0399 #11 Y:2009 Recover waste heat from equipment $2,309 $4,560
WV0399 #10 Y:2009 Insulate bare equipment $2,955 $3,544
WV0399 #09 Y:2009 Establish a predictive maintenance program $3,930 $1,000
WV0399 #08 Y:2009 Eliminate or reduce compressed air usage $6,515 $1,717
WV0399 #07 Y:2009 Utilize higher efficiency lamps and/or ballasts $9,889 -
WV0399 #06 Y:2009 Utilize energy-efficient belts and other improved mechanisms $16,812 -
WV0399 #05 Y:2009 Develop a repair/replace policy $18,121 $1,644
WV0399 #04 Y:2009 Use waste heat from hot flue gases to preheat $37,930 $39,900
WV0399 #03 Y:2009 Cover open tanks $83,144 $7,290
WV0399 #02 Y:2009 Recover waste heat from equipment $154,014 $106,000
WV0399 #01 Y:2009 Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $215,411 $540,000
OR0548 #08 Y:2009 Install / repair insulation on steam lines $3,500 $600
OR0548 #07 Y:2009 Upgrade controls on compressors $7,349 -