386
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Hardwood veneer and plywood | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0564 #01 Y:2010 | 01 | 2010 | Install soft-start to eliminate nuisance trips | $11,375 | $32,340 | |
| OR0555 #04 Y:2010 | 04 | 2010 | Utilize energy-efficient belts and other improved mechanisms | $2,054 | $1 | |
| OR0555 #03 Y:2010 | 03 | 2010 | Remove or close off unneeded compressed air lines | $15,978 | $11,900 | |
| OR0555 #02 Y:2010 | 02 | 2010 | Install smaller boiler (increase high fire duty cycle) | $32,115 | $37,100 | |
| OR0555 #01 Y:2010 | 01 | 2010 | Improve combustion control capability | $257,883 | $405,450 | |
| WV0399 #13 Y:2009 | 13 | 2009 | Utilize higher efficiency lamps and/or ballasts | $1,498 | $4,153 | |
| WV0399 #12 Y:2009 | 12 | 2009 | Reduce the pressure of compressed air to the minimum required | $2,246 | $26 | |
| WV0399 #11 Y:2009 | 11 | 2009 | Recover waste heat from equipment | $2,309 | $4,560 | |
| WV0399 #10 Y:2009 | 10 | 2009 | Insulate bare equipment | $2,955 | $3,544 | |
| WV0399 #09 Y:2009 | 09 | 2009 | Establish a predictive maintenance program | $3,930 | $1,000 | |
| WV0399 #08 Y:2009 | 08 | 2009 | Eliminate or reduce compressed air usage | $6,515 | $1,717 | |
| WV0399 #07 Y:2009 | 07 | 2009 | Utilize higher efficiency lamps and/or ballasts | $9,889 | - | |
| WV0399 #06 Y:2009 | 06 | 2009 | Utilize energy-efficient belts and other improved mechanisms | $16,812 | - | |
| WV0399 #05 Y:2009 | 05 | 2009 | Develop a repair/replace policy | $18,121 | $1,644 | |
| WV0399 #04 Y:2009 | 04 | 2009 | Use waste heat from hot flue gases to preheat | $37,930 | $39,900 | |
| WV0399 #03 Y:2009 | 03 | 2009 | Cover open tanks | $83,144 | $7,290 | |
| WV0399 #02 Y:2009 | 02 | 2009 | Recover waste heat from equipment | $154,014 | $106,000 | |
| WV0399 #01 Y:2009 | 01 | 2009 | Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $215,411 | $540,000 | |
| OR0548 #08 Y:2009 | 08 | 2009 | Install / repair insulation on steam lines | $3,500 | $600 | |
| OR0548 #07 Y:2009 | 07 | 2009 | Upgrade controls on compressors | $7,349 | - |