Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Plywood
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 228
Plant Area 180,000
ft2
Annual Production 30,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,023,000 19,964,000
kWh
Electricity Demand $135,557 24,601
kW-mo/yr
Natural Gas $11,394 1,028
MMBtu
Wood $456,800 242,675
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,972

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Personnel Changes Savings
01 2.4112: Install soft-start to eliminate nuisance trips $11,375 $32,340 $9,074
212,908
kWh
$2,301
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $31,314 $31,314 $24,881
583,785
kWh
$6,433
-
kW-mo/yr
- -
03 2.4224: Upgrade controls on compressors $9,666 $40,000 $7,681
180,207
kWh
$1,985
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,849 $7,575 $2,849
66,857
kWh
- - -
05 2.2515: Use optimum thickness insulation $64,658 $105,222 - - $64,658
-
MMBtu
-
06 2.7135: Install occupancy sensors $7,248 $31,290 $5,304
124,440
kWh
$205
-
kW-mo/yr
- $1,739
TOTAL RECOMMENDED $127,110 $247,741 $49,789
1,168,197
kWh
$10,924
-
kW-mo/yr
$64,658
-
MMBtu
$1,739
TOTAL IMPLEMENTED $95,972 $136,536 $24,881
583,785
kWh
$6,433
-
kW-mo/yr
$64,658
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs