ITAC Assessment: CO0043
ITAC logo
ITAC Assessment: CO0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product BRICKS & CINDER BLOCKS
NAICS
n/a
SIC 3271: Concrete Block and Brick
Sales Range $5
M
to 10
M
# of Employees 42
Plant Area
n/a
Annual Production 7,000,000
pieces
Production Hrs. Annual 3,172
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,441 995,018
kWh
Natural Gas $104,510 23,109
MMBtu
Other Energy $33,967 3,575
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,756 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,724

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $4,067 $275 - $4,067
-
MMBtu
-
02 2.1222: Install turbulators $1,154 $800 - $1,154
-
MMBtu
-
03 2.2414: Use waste heat from hot flue gases to preheat $4,384 $10,000 - $4,384
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $743 $150 $743
9,672
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $398 $150 $398
5,275
kWh
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $3,663 $1,620 - $3,663
-
MMBtu
-
07 2.7492: Use proper thickness of insulation on building envelope $512 $1,799 - $512
-
MMBtu
-
08 2.2136: Install / repair insulation on steam lines $297 $295 - $297
-
MMBtu
-
09 2.6212: Turn off equipment during breaks, reduce operating time $178 $50 $178
2,345
kWh
- -
10 2.4133: Use most efficient type of electric motors $1,316 $50 $1,316
17,292
kWh
- -
11 2.8223: Add air shields to trucks to increase fuel mileage $1,358 $100 - - $1,358
-
MMBtu
12 2.7111: Reduce illumination to minimum necessary levels $686 $564 $686
9,086
kWh
- -
TOTAL RECOMMENDED $18,756 $15,853 $3,321
43,670
kWh
$14,077
-
MMBtu
$1,358
-
MMBtu
TOTAL IMPLEMENTED $11,724 $4,953 $1,827
24,033
kWh
$8,539
-
MMBtu
$1,358
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs