| Assessment Year | 2010 |
|---|---|
| Principal Product | Veneer Studs |
| NAICS | 321211: Hardwood Veneer and Plywood Manufacturing |
| SIC | 2435: Hardwood Veneer and Plywood |
| Sales Range | $10 M to 50M |
| # of Employees | 228 |
| Plant Area |
180,000
ft2
|
| Annual Production | 18,000,000
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,148,813 | 18,795,898 |
kWh
|
$0.061 |
| Natural Gas | $7,220 | 541 |
MMBtu
|
$13.35 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $308,030 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,032 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1116: Improve combustion control capability | $257,883 | $405,450 | - |
$257,883
-
MMBtu
|
|
| 02 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $32,115 | $37,100 |
$32,115
724,292
kWh
|
- | |
| 03 | 2.4235: Remove or close off unneeded compressed air lines | $15,978 | $11,900 |
$15,978
354,929
kWh
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,054 | $1 |
$2,054
36,617
kWh
|
- | |
| TOTAL RECOMMENDED | $308,030 | $454,451 |
$50,147
1,115,838
kWh
|
$257,883
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $18,032 | $11,901 |
$18,032
391,546
kWh
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs