ITAC Assessment: OR0555
ITAC logo
ITAC Assessment: OR0555
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Veneer Studs
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 228
Plant Area 180,000
ft2
Annual Production 18,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,148,813 18,795,898
kWh
Natural Gas $7,220 541
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $308,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,032

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.1116: Improve combustion control capability $257,883 $405,450 - $257,883
-
MMBtu
02 2.1223: Install smaller boiler (increase high fire duty cycle) $32,115 $37,100 $32,115
724,292
kWh
-
03 2.4235: Remove or close off unneeded compressed air lines $15,978 $11,900 $15,978
354,929
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,054 $1 $2,054
36,617
kWh
-
TOTAL RECOMMENDED $308,030 $454,451 $50,147
1,115,838
kWh
$257,883
-
MMBtu
TOTAL IMPLEMENTED $18,032 $11,901 $18,032
391,546
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs