Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

118

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sawmills and planing mills, general
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0437 #05 Y:2003 Install / repair insulation on steam lines $9,910 $14,200
OR0437 #04 Y:2003 Analyze flue gas for proper air/fuel ratio $3,000 $150
OR0437 #03 Y:2003 Make a practice of turning off lights when not needed $11,950 $880
OR0437 #02 Y:2003 Upgrade controls on compressors $3,700 $2,000
OR0437 #01 Y:2003 Use or replace with energy efficient substitutes $7,000 $580
OR0433 #07 Y:2003 Utilize energy-efficient belts and other improved mechanisms $495 -
OR0433 #06 Y:2003 Use most efficient type of electric motors $4,390 $10,800
OR0433 #05 Y:2003 Reduce the pressure of compressed air to the minimum required $7,780 $15,000
OR0433 #04 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $3,080 $3,000
OR0433 #03 Y:2003 Shift from daytime to nighttime operation $9,500 -
OR0433 #02 Y:2003 Modify process to reduce material use/cost $78,000 $62,900
OR0433 #01 Y:2003 Modify process to reduce material use/cost $117,000 $150,300
OR0398 #05 Y:2001 Eliminate leaks in inert gas and compressed air lines/ valves $799 $800
OR0398 #04 Y:2001 Use most efficient type of electric motors $10,080 $37,263
OR0398 #03 Y:2001 Optimize plant power factor $12,184 $12,000
OR0398 #02 Y:2001 Use adjustable frequency drive or multiple speed motors on existing system $20,011 $85,079
OR0398 #01 Y:2001 Install sensors to detect defects $1,495,000 $2,000,000
OR0192 #06 Y:1993 Utilize energy-efficient belts and other improved mechanisms $6,631 $30,340
OR0192 #05 Y:1993 Optimize plant power factor $2,478 $7,050
OR0192 #04 Y:1993 Use most efficient type of electric motors $1,115 $2,857