ITAC Assessment: OR0433
ITAC logo
ITAC Assessment: OR0433
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product green dimensional lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 40,000
ft2
Annual Production 17,524,500
units
Production Hrs. Annual 1,960
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,202 1,481,000
kWh
Electricity Demand $54,965 10,410
kW-mo/yr
Electricity Fees $5,136 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $220,245 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $132,250

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings Primary Product Savings
01 4.131: Modify process to reduce material use/cost $117,000 $150,300 - - $117,000 -
02 4.131: Modify process to reduce material use/cost $78,000 $62,900 n/a - - - $78,000
03 2.3134: Shift from daytime to nighttime operation $9,500 - - $9,500
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,080 $3,000 $2,160
51,600
kWh
$920
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $7,780 $15,000 $4,670
111,160
kWh
$3,110
-
kW-mo/yr
- -
06 2.4133: Use most efficient type of electric motors $4,390 $10,800 $2,330
55,300
kWh
$2,060
-
kW-mo/yr
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $495 - $265
2,380
kWh
$230
-
kW-mo/yr
- -
TOTAL RECOMMENDED $220,245 $242,000 $9,425
220,440
kWh
$15,820
-
kW-mo/yr
$117,000 $78,000
TOTAL IMPLEMENTED $132,250 $179,100 $9,160
218,060
kWh
$6,090
-
kW-mo/yr
$117,000 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs