ITAC Assessment: WI0030
ITAC logo
ITAC Assessment: WI0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FABRICATION JOB SHOP
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,125
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,713 1,207,503
kWh
Natural Gas $34,421 6,746
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,450 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,909

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4312: Improve lubrication practices $2,541 - $2,541
35,463
kWh
-
02 2.2437: Recover waste heat from equipment $3,548 $1,400 - $3,548
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $184 $468 $184
2,638
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,177 $2,100 - $3,177
-
MMBtu
TOTAL RECOMMENDED $9,450 $3,968 $2,725
38,101
kWh
$6,725
-
MMBtu
TOTAL IMPLEMENTED $6,909 $3,968 $184
2,638
kWh
$6,725
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs