Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,280

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Lumber and wood products, except furniture
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0210 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,730 $24
IP0210 #05 Y:2025 Recover heat from exhausted steam, hot air or hot water $8,048 $908
IP0210 #04 Y:2025 Install automatic stack damper $73,852 $1,600
IP0210 #03 Y:2025 Conserve energy by efficient use of vending machines $1,349 -
IP0210 #02 Y:2025 Eliminate or reduce compressed air usage $5,916 -
IP0210 #01 Y:2025 Reduce space conditioning during non-working hours $6,099 -
UD1107 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,839 $5,280
UD1107 #04 Y:2025 Eliminate or reduce compressed air usage $412 $900
UD1107 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,345 $953
UD1107 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $69,274 -
UD1107 #01 Y:2025 Optimize plant power factor $228,685 $136,500
AS0600 #07 Y:2025 Conserve energy by efficient use of vending machines $312 $279
AS0600 #06 Y:2025 Pay bills on time to avoid late fees $1,132 $39
AS0600 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,357 $495
AS0600 #04 Y:2025 Utilize energy-efficient belts and other improved mechanisms $2,289 $15,555
AS0600 #03 Y:2025 Eliminate old stock and modify inventory control $8,750 $276
AS0600 #02 Y:2025 Use solar heat to make electricty $37,872 $274,416
AS0600 #01 Y:2025 Install an uninteruptable power supply $274,416 $2,377,539
NT0036 #04 Y:2024 Optimize plant power factor $6,170 $16,268
NT0036 #03 Y:2024 Turn off equipment during breaks, reduce operating time $3,825 -