ITAC Assessment: UA0298
ITAC logo
ITAC Assessment: UA0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Kitchen Cabinets
NAICS 337110: Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434: Wood Kitchen Cabinets
Sales Range $1
M
to 5
M
# of Employees 525
Plant Area 507,150
ft2
Annual Production 230,000
units
Production Hrs. Annual 2,625
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $970,749 7,248,260
kWh
Electricity Demand $51,680 10,903
kW-mo/yr
Electricity Fees $74,829 -
Natural Gas $309,542 31,100
MMBtu
TOTAL YEARLY COSTS $1,406,800
RECOMMENDED SAVINGS* $673,991 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $557,887 $5,002,920 $515,280
3,942,461
kWh
$4,555
-
kW-mo/yr
$38,052 -
02 2.3212: Optimize plant power factor $6,398 $1,977 - $5,962
-
kW-mo/yr
$436 -
03 2.4239: Eliminate or reduce compressed air usage $7,813 $20,150 $7,280
55,703
kWh
- $533 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $27,681 $7,744 $20,342
155,641
kWh
$5,451
-
kW-mo/yr
$1,888 -
05 2.4231: Reduce the pressure of compressed air to the minimum required $19,072 $804 $12,585
96,287
kWh
$5,186
-
kW-mo/yr
$1,301 -
06 2.4224: Upgrade controls on compressors $15,539 $2,872 $9,891
75,678
kWh
$4,588
-
kW-mo/yr
$1,060 -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,457 $7,761 $20,377
155,904
kWh
$2,412
-
kW-mo/yr
$1,668 -
08 2.7261: Install timers and/or thermostats $2,303 $886 $2,145
16,420
kWh
- $158 -
09 2.7231: Use radiant heater for spot heating $6,438 $20,795 - - - $6,438
-
MMBtu
10 2.7142: Utilize higher efficiency lamps and/or ballasts $3,652 $12,707 $1,995
15,263
kWh
$1,408
-
kW-mo/yr
$249 -
11 2.7135: Install occupancy sensors $2,751 $2,642 $2,563
19,613
kWh
- $188 -
TOTAL RECOMMENDED $673,991 $5,081,258 $592,458
4,532,970
kWh
$29,562
-
kW-mo/yr
$45,533 $6,438
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs