Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

155

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated textile products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CC0017 #06 Y:2023 Use solar heat to make electricty $139,613 $1,192,963
CC0017 #05 Y:2023 Make a practice of turning off lights when not needed $1,525 -
CC0017 #04 Y:2023 Install occupancy sensors $4,836 $6,196
CC0017 #03 Y:2023 Turn off equipment when not in use $6,445 -
CC0017 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $3,997 $8,484
CC0017 #01 Y:2023 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $90,004 -
LS2105 #06 Y:2021 Use solar heat to make electricty $40,438 $646,020
LS2105 #05 Y:2021 Utilize energy-efficient belts and other improved mechanisms $133 $580
LS2105 #04 Y:2021 Utilize higher efficiency lamps and/or ballasts $9,725 $9,408
LS2105 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $5,367 $675
LS2105 #02 Y:2021 Reduce the pressure of compressed air to the minimum required $455 $50
LS2105 #01 Y:2021 Install timers and/or thermostats $1,466 $100
CL1705 #04 Y:2017 Utilize energy-efficient belts and other improved mechanisms $2,097 $900
CL1705 #03 Y:2017 Use flow control valves on equipment to optimize water use $15,929 $3,050
CL1705 #02 Y:2017 Utilize higher efficiency lamps and/or ballasts $95,734 $244,620
CL1705 #01 Y:2017 Install waste heat boiler to provide direct power $148,148 $211,152
NC0585 #12 Y:2016 Turn off equipment when not in use $754 $100
NC0585 #11 Y:2016 Reschedule plant operations or reduce load to avoid peaks $2,207 $100
NC0585 #10 Y:2016 Reduce the pressure of compressed air to the minimum required $286 $100
NC0585 #09 Y:2016 Use / purchase optimum sized compressor $1,023 $500