Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Greige textile products
NAICS 314999: All Other Miscellaneous Textile Product Mills
SIC 2399: Fabricated Textile Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 413
Plant Area 620,332
ft2
Annual Production 19,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,399,039 46,548,000
kWh
Electricity Demand $105,043 7,758
kW-mo/yr
Natural Gas $293,332 67,158
MMBtu
Waste Disposal Costs
Water Usage $159,292 38,700
Tgal
TOTAL YEARLY COSTS $2,956,706
RECOMMENDED SAVINGS* $261,908 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.2421: Install waste heat boiler to provide direct power $148,148 $211,152 - - $148,148
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $95,734 $244,620 $62,951
1,210,588
kWh
$32,783
-
kW-mo/yr
- -
03 3.4156: Use flow control valves on equipment to optimize water use $15,929 $3,050 - - - $15,929
-
Tgal
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,097 $900 $1,379
26,520
kWh
$718
-
kW-mo/yr
- -
TOTAL RECOMMENDED $261,908 $459,722 $64,330
1,237,108
kWh
$33,501
-
kW-mo/yr
$148,148
-
MMBtu
$15,929
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs