ITAC Assessment: NC0585
ITAC logo
ITAC Assessment: NC0585
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Screen print and embroidery goods
NAICS 313310: Textile and Fabric Finishing Mills
SIC 2399: Fabricated Textile Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 90,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,125
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,066 900,096
kWh
Electricity Demand $54,757 3,389
kW-mo/yr
Electricity Fees $529 -
Natural Gas $4,229 552
MMBtu
TOTAL YEARLY COSTS $102,581
RECOMMENDED SAVINGS* $23,998 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,998

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $1,989 $500 - $1,989
-
kW-mo/yr
- - -
02 2.8114: Change rate schedules or other changes in utility service $8,291 $100 $(-9,107.0)
-
kWh
$17,398
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,830 $5,000 $3,320
69,456
kWh
$3,448
-
kW-mo/yr
- - $1,062
04 2.7142: Utilize higher efficiency lamps and/or ballasts $560 $2,000 $477
9,986
kWh
- - - $83
05 2.7122: Disconnect ballasts $307 $225 $151
3,150
kWh
$156
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $136 $521 $136
2,835
kWh
- - - -
07 2.7134: Use photocell controls $47 $50 $47
990
kWh
- - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $568 $100 $705
14,747
kWh
$263
-
kW-mo/yr
- $(-200.0) $(-200.0)
09 2.4226: Use / purchase optimum sized compressor $1,023 $500 $1,023
21,411
kWh
- - - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $286 $100 $209
4,368
kWh
$77
-
kW-mo/yr
- - -
11 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,207 $100 $(-49.0)
-
kWh
$2,256
-
kW-mo/yr
- - -
12 2.6218: Turn off equipment when not in use $754 $100 $290
6,071
kWh
$103
-
kW-mo/yr
$361
-
MMBtu
- -
TOTAL RECOMMENDED $23,998 $9,296 $(-2,798.0)
133,014
kWh
$25,690
-
kW-mo/yr
$361
-
MMBtu
$(-200.0) $945
TOTAL IMPLEMENTED $23,998 $9,296 $(-2,798.0)
133,014
kWh
$25,690
-
kW-mo/yr
$361
-
MMBtu
$(-200.0) $945
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs