Assessment Year | 2017 |
---|---|
Principal Product | Screen print and embroidery goods |
NAICS | 313310: Textile and Fabric Finishing Mills |
SIC | 2399: Fabricated Textile Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
90,000
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $43,066 | 900,096 |
kWh
|
$0.048 |
Electricity Demand | $54,757 | 3,389 |
kW-mo/yr
|
$16.16 |
Electricity Fees | $529 | - |
|
- |
Natural Gas | $4,229 | 552 |
MMBtu
|
$7.66 |
TOTAL YEARLY COSTS | $102,581 | |||
RECOMMENDED SAVINGS* | $23,998 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,998 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $1,989 | $500 | - |
$1,989
-
kW-mo/yr
|
- | - | - | |
02 | 2.8114: Change rate schedules or other changes in utility service | $8,291 | $100 |
$(-9,107.0)
-
kWh
|
$17,398
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,830 | $5,000 |
$3,320
69,456
kWh
|
$3,448
-
kW-mo/yr
|
- | - | $1,062 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $560 | $2,000 |
$477
9,986
kWh
|
- | - | - | $83 | |
05 | 2.7122: Disconnect ballasts | $307 | $225 |
$151
3,150
kWh
|
$156
-
kW-mo/yr
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $136 | $521 |
$136
2,835
kWh
|
- | - | - | - | |
07 | 2.7134: Use photocell controls | $47 | $50 |
$47
990
kWh
|
- | - | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $568 | $100 |
$705
14,747
kWh
|
$263
-
kW-mo/yr
|
- | $(-200.0) | $(-200.0) | |
09 | 2.4226: Use / purchase optimum sized compressor | $1,023 | $500 |
$1,023
21,411
kWh
|
- | - | - | - | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $286 | $100 |
$209
4,368
kWh
|
$77
-
kW-mo/yr
|
- | - | - | |
11 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,207 | $100 |
$(-49.0)
-
kWh
|
$2,256
-
kW-mo/yr
|
- | - | - | |
12 | 2.6218: Turn off equipment when not in use | $754 | $100 |
$290
6,071
kWh
|
$103
-
kW-mo/yr
|
$361
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $23,998 | $9,296 |
$(-2,798.0)
133,014
kWh
|
$25,690
-
kW-mo/yr
|
$361
-
MMBtu
|
$(-200.0) | $945 | ||
TOTAL IMPLEMENTED | $23,998 | $9,296 |
$(-2,798.0)
133,014
kWh
|
$25,690
-
kW-mo/yr
|
$361
-
MMBtu
|
$(-200.0) | $945 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs