ITAC Assessment: MS0292
ITAC logo
ITAC Assessment: MS0292
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Toilet Seats
NAICS 314999: All Other Miscellaneous Textile Product Mills
SIC 2399: Fabricated Textile Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 300,000
ft2
Annual Production 7,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,070,809 25,368,440
kWh
Electricity Demand $297,108 60,120
kW-mo/yr
Electricity Fees $69,672 -
Natural Gas $623,234 67,810
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,248 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,295

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,743 $34,278 $11,733
274,788
kWh
$2,791
-
kW-mo/yr
$219
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,311 $46,268 $6,609
154,783
kWh
$1,579
-
kW-mo/yr
$123
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,836 $21,282 $4,765
111,583
kWh
- $71
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,405 $231 $2,370
55,501
kWh
- $35
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $953 $753 $761
17,830
kWh
$178
-
kW-mo/yr
$14
TOTAL RECOMMENDED $31,248 $102,812 $26,238
614,485
kWh
$4,548
-
kW-mo/yr
$462
TOTAL IMPLEMENTED $30,295 $102,059 $25,477
596,655
kWh
$4,370
-
kW-mo/yr
$448
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs