ITAC Assessment: OK0452
ITAC logo
ITAC Assessment: OK0452
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product AC and DC motors
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $50
M
to 100
M
# of Employees 498
Plant Area 200,000
ft2
Annual Production 800,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $334,335 6,527,843
kWh
Natural Gas $31,573 7,713
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,878 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,750

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $17,658 $12,000 $24,268
442,849
kWh
$(-6,610.0)
-
MMBtu
02 2.7241: Install outside air damper / economizer on hvac unit $9,302 - $9,302
364,889
kWh
-
03 2.2437: Recover waste heat from equipment $790 $1,351 - $790
-
MMBtu
04 2.7224: Reduce space conditioning during non-working hours $128 $237 - $128
-
MMBtu
TOTAL RECOMMENDED $27,878 $13,588 $33,570
807,738
kWh
$(-5,692.0)
-
MMBtu
TOTAL IMPLEMENTED $27,750 $13,351 $33,570
807,738
kWh
$(-5,820.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs