ITAC Assessment: SJ0043
ITAC logo
ITAC Assessment: SJ0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Medical devices
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 65,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 3,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,436 818,149
kWh
Electricity Demand $161,091 2,250
kW-mo/yr
Natural Gas $85,066 4,214
MMBtu
TOTAL YEARLY COSTS $340,593
RECOMMENDED SAVINGS* $155,034 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $76,223 $468,058 $76,223
385,212
kWh
- -
02 2.7135: Install occupancy sensors $4,740 $2,894 $1,878
16,327
kWh
$2,862
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $551 - $551
4,795
kWh
- -
04 2.4239: Eliminate or reduce compressed air usage $97 $264 $97
840
kWh
- -
05 2.7232: Replace existing hvac unit with high efficiency model $10,396 $50,000 $4,765
41,436
kWh
$5,631
-
kW-mo/yr
-
06 2.2211: Use optimum temperature $43,185 - $5,965
51,873
kWh
- $37,220
-
MMBtu
07 2.6127: Maintain air filters by cleaning or replacement $14,251 $1,430 $14,251
123,922
kWh
- -
08 2.3191: Use demand controller or load shedder $5,591 - - $5,591
-
kW-mo/yr
-
TOTAL RECOMMENDED $155,034 $522,646 $103,730
624,405
kWh
$14,084
-
kW-mo/yr
$37,220
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs