ITAC Assessment: IC0300
ITAC logo
ITAC Assessment: IC0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Animal Feeding Oils
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 6
Plant Area 174,240
ft2
Annual Production 88,000,000
lb
Production Hrs. Annual 2,470
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,818 326,307
kWh
Electricity Demand $14,117 1,372
kW-mo/yr
Electricity Fees $6,497 -
Natural Gas $64,684 18,272
MMBtu
TOTAL YEARLY COSTS $100,116
RECOMMENDED SAVINGS* $77,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $15,186 $96,427 $6,369
141,538
kWh
$8,816
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $772 $1,100 $361
8,022
kWh
$411
-
kW-mo/yr
-
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $14,349 - - - $14,349
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,727 $3,127 $3,963
88,072
kWh
$3,764
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $765 $658 - - $765
-
MMBtu
06 2.2113: Repair or replace steam traps $4,021 $2,910 - - $4,021
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,452 $129 $67
1,482
kWh
$1,385
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $930 $1,854 $441
9,794
kWh
$490
-
kW-mo/yr
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,041 $3,140 $967
21,482
kWh
$1,074
-
kW-mo/yr
-
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,457 - $1,638
36,389
kWh
$1,819
-
kW-mo/yr
-
11 2.2135: Repair and eliminate steam leaks $6,508 $474 - - $6,508
-
MMBtu
12 2.6127: Maintain air filters by cleaning or replacement $188 - $89
1,976
kWh
$99
-
kW-mo/yr
-
13 2.4239: Eliminate or reduce compressed air usage $1,410 - $686
15,246
kWh
$724
-
kW-mo/yr
-
14 2.2121: Increase amount of condensate returned $18,674 $14,800 $(-283.7)
(-6,304)
kWh
$(-298.8)
-
kW-mo/yr
$19,257
-
MMBtu
15 2.7142: Utilize higher efficiency lamps and/or ballasts $481 $1,052 $228
5,068
kWh
$253
-
kW-mo/yr
-
TOTAL RECOMMENDED $77,960 $125,670 $14,524
322,766
kWh
$18,536
-
kW-mo/yr
$44,899
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs