209
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UL2503 #05 Y:2025 | 05 | 2025 | Recover waste heat from equipment | $2,094 | $7,500 |
n/a
|
UL2503 #04 Y:2025 | 04 | 2025 | Use solar heat to make electricty | $53,722 | $482,406 |
n/a
|
UL2503 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $17,129 | $32,120 |
n/a
|
UL2503 #02 Y:2025 | 02 | 2025 | Optimize plant power factor | $6,739 | $14,223 |
n/a
|
UL2503 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,701 | $2,100 |
n/a
|
UU0246 #07 Y:2024 | 07 | 2024 | Use automatic flow control | $4,727 | $4,633 | |
UU0246 #06 Y:2024 | 06 | 2024 | Use solar heat to make electricty | $8,970 | $42,406 | |
UU0246 #05 Y:2024 | 05 | 2024 | Turn off equipment during breaks, reduce operating time | $1,731 | $338 | |
UU0246 #04 Y:2024 | 04 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $520 | $123 | |
UU0246 #03 Y:2024 | 03 | 2024 | Reduce the pressure of compressed air to the minimum required | $1,628 | $3,000 | |
UU0246 #02 Y:2024 | 02 | 2024 | Optimize plant power factor | $3,514 | $9,000 | |
UU0246 #01 Y:2024 | 01 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $439 | $900 | |
UU0211 #06 Y:2022 | 06 | 2022 | Install compressor air intakes in coolest locations | $433 | $3,100 | |
UU0211 #05 Y:2022 | 05 | 2022 | Optimize plant power factor | $2,330 | $6,230 | |
UU0211 #04 Y:2022 | 04 | 2022 | Use hot process fluids to preheat incoming process fluids | $3,351 | $26,250 | |
UU0211 #03 Y:2022 | 03 | 2022 | Demolish old building to reduce tax and insurance bills | $7,263 | $12,600 | |
UU0211 #02 Y:2022 | 02 | 2022 | Purchase gas directly from a contract gas supplier | $22,030 | $18,300 | |
UU0211 #01 Y:2022 | 01 | 2022 | Replace boiler | $24,600 | $111,300 | |
SF0588 #05 Y:2022 | 05 | 2022 | Use solar heat to make electricty | $28,848 | $137,044 | |
SF0588 #04 Y:2022 | 04 | 2022 | Combine utility meters | $7,304 | $15,000 |